How to Calculate Slope (Simple Formula for Any Project)

Slope shows up in almost every trade—concrete, grading, pipe work, landscaping, framing, and more. Even though you can plug numbers into a calculator, understanding how slope actually works helps you measure accurately, set layouts correctly, and avoid costly mistakes on any jobsite..

Related Guides

Construction Math Calculators

What You’ll Learn in This Guide

  • What slope actually is and how rise and run work in real‑world construction

  • How to calculate slope using the simple rise‑over‑run formula

  • How to convert slope into percent grade and inches‑per‑foot

  • How much slope you need for concrete drainage, patios, driveways, and walkways

  • How to measure slope on the job using a level, string line, or laser

  • Common mistakes to avoid when calculating or setting slope

  • Real examples you can use on forms, slabs, and outdoor projects

Why It Matters

Slope isn’t just a math term — it’s what keeps water moving away from your concrete instead of sitting on it. When you understand how rise and run work, you can set forms correctly, avoid drainage problems, and make sure your slab performs the way it should. A calculator can give you the numbers, but knowing the formula yourself helps you double‑check measurements, catch mistakes early, and lay out any project with confidence.

Step‑by‑Step: How to Calculate Slope

  1. Measure the run Measure the horizontal distance between your two points.

Run=horizontal distance
  1. Measure the rise Measure how much higher or lower the end point is compared to the start.

Rise=height difference
  1. Use the slope formula Divide rise by run.

Slope=RiseRun
  1. Convert to percent grade (optional) Multiply the slope by 100.

Percent grade=Slope×100
  1. Convert to inches per foot (optional) If your run is in feet, multiply the slope by 12 to get inches of rise per foot of run.

Inches per foot=Slope×12
  1. Compare to your target slope Check your result against the required slope for drainage or code so you know if you need to adjust your forms or layout.

Real‑World Example (Explained Clearly)

Now that you know the slope formula, here’s how it applies in the real world. A lot of trades work in tenths and elevation, especially anything tied to sea level.

Let’s say you’re running pipe from one manhole to another. The first manhole sits at 685 feet above sea level. The next manhole on your print is at 688 feet. The distance between them is 120 feet.

First, find the difference in elevation:

688−685=3 feet of rise

Then divide that rise by your total run:

3120=0.025

Multiply by 100 to convert it to percent grade:

0.025×100=2.5%

This is the exact same process no matter what trade you’re in. Whether you’re setting a concrete pad, running pipe, grading, or checking pitch, this formula helps you work accurately and confidently. Knowing how to do the math—not just punching numbers into a calculator—will make you better in any field you choose.

Final Thoughts

These math guides come straight from the heart. I know they might not reach everyone, but I wish resources like this existed when I was younger and learning the hard way. If anything here helps you—even years down the road—I’m glad it found you. That’s why I write these: to make the work easier for the next person coming up.

And if you stick with it, keep learning, and keep sharpening your skills, this kind of knowledge will carry you far in whatever trade you choose.

Ready to figure out how to calculate how many yards of concrete you need?

Scroll to Top